29 Oct 2026

Sawaed Al-Hamra Real Estate Project 105

52%Overall▲ +13% · vs previous visit

Main video

Engineering Report

The project has seen significant progress in the concrete structure and interior finishing works, with ongoing masonry and roof preparation, bringing the total completion rate to 52%.
Detected changes
Concrete Structure and Masonry95%

Completion of the top floor slab casting and brick masonry for facades and typical floors, with safety scaffolding remaining in place.

Interior Finishing Works90%

Commencement of interior wall plastering and ceramic tile installation in selected areas, alongside ongoing electrical and plumbing installations.

Progress reading

The images reflect substantial development in the concrete structure (95%) compared to the previous visit, alongside tangible progress in finishing works (30%), which are now clearly visible in the plastering and wall cladding stages.

vs previous visit

Compared to the previous visit, the entire concrete structure for the upper floors has been completed, and masonry and interior finishing works have expanded significantly, whereas the previous visit showed the building in its early structural stages.

Expected next milestones

Completion of plastering works for the entire building, commencement of roof waterproofing, and intensification of electrical and plumbing installations on the remaining floors.

Progress

0%OverallAverage item progress
1/5 completeavg ▲ +13%
Excavation Works
0%
Concrete Works▲ +35%
0%
Finishing Works▲ +15%
0%
Electrical Works▲ +5%
0%
Plumbing Works▲ +10%
0%